disk-gc: 2026-07-09 run — amdpve Docker bloat resolved (11.56GB) #6

Merged
abiba-bot merged 1 commits from feat/disk-gc-amdpve-2026-07-09 into master 2026-07-09 05:23:31 +00:00
Owner

Threat Resolved

amdpve (.15): 78% → 62% after reclaiming 11.56GB (abandoned ROCm/HIP Docker image).

Changes

  • 2026-07-09 incident log
  • Access matrix with pct-run verification (15 CTs)
  • GPU bare-metal scan scope
  • Post-migration cleanup step

Verification

Post-GC re-scan: 18/18 hosts GREEN.

## Threat Resolved amdpve (.15): 78% → 62% after reclaiming 11.56GB (abandoned ROCm/HIP Docker image). ## Changes - 2026-07-09 incident log - Access matrix with pct-run verification (15 CTs) - GPU bare-metal scan scope - Post-migration cleanup step ## Verification Post-GC re-scan: 18/18 hosts GREEN.
abiba-bot added 1 commit 2026-07-09 05:21:21 +00:00
disk-gc: 2026-07-09 run — amdpve Docker bloat resolved (11.56GB reclaimed), access matrix documented, pct-run verified for all 15 CTs
PR Pipeline — Authorize → Validate → Review → Merge / auth (pull_request) Successful in 3s
PR Pipeline — Authorize → Validate → Review → Merge / validate (pull_request) Successful in 1s
PR Pipeline — Authorize → Validate → Review → Merge / lint (pull_request) Successful in 2s
PR Pipeline — Authorize → Validate → Review → Merge / ai-review (pull_request) Successful in 4s
PR Pipeline — Authorize → Validate → Review → Merge / gate (pull_request) Successful in 1s
15e8998289
abiba-bot merged commit a3786ab289 into master 2026-07-09 05:23:31 +00:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: SyslogSolution/prose-contracts#6