[SCRATCH PROBE] paths evaluated on PR diff vs latest commit #101

Closed
abiba-bot wants to merge 2 commits from ci-proof/20260915-pathscope into master
Owner

Two commits: c1 adds probe-pathscope.yaml (matches OLD filter), c2 adds deliverables only (latest commit, does NOT match). Run appears => PR-diff semantics; absent => latest-commit semantics. Scratch PR - will be closed/deleted.

Two commits: c1 adds probe-pathscope.yaml (matches OLD filter), c2 adds deliverables only (latest commit, does NOT match). Run appears => PR-diff semantics; absent => latest-commit semantics. Scratch PR - will be closed/deleted.
abiba-bot added 2 commits 2026-09-15 12:16:35 +00:00
scratch(pathscope): commit 2 - deliverables only (latest commit)
PR Pipeline — Authorize → Validate → Review → Merge / auth (pull_request) Successful in 13s
PR Pipeline — Authorize → Validate → Review → Merge / validate (pull_request) Successful in 3s
PR Pipeline — Authorize → Validate → Review → Merge / lint (pull_request) Successful in 6s
PR Pipeline — Authorize → Validate → Review → Merge / ai-review (pull_request) Successful in 6s
PR Pipeline — Authorize → Validate → Review → Merge / gate (pull_request) Successful in 0s
ec533925b6
abiba-bot closed this pull request 2026-09-15 12:23:45 +00:00

Pull request closed

This pull request cannot be reopened because the branch was deleted.
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: SyslogSolution/prose-contracts#101