Add check-health section with live probes to infrastructure-monitoring contract #51

Merged
abiba-bot merged 1 commits from fix/infra-check-health into master 2026-08-23 00:01:40 +00:00
Owner

Captain-priority fix (2026-08-22): infrastructure-monitoring kept returning canned HTTP 000 reports because the contract had no execution procedure. Adds an explicit check-health section under Execution with real live probes (Zulip POST, pm2 jlist, GPU exporters .8/.110/.15:9400, Prometheus .116:9090, Grafana .116:3001, LiteLLM .116:4001) and a hard RUN LIVE, NEVER ECHO rule. Mirrors the gpu-monitor contract pattern. Single clean commit from master - no conflicts. Merge authority: captain (no-mistakes, yolo off).

Captain-priority fix (2026-08-22): infrastructure-monitoring kept returning canned HTTP 000 reports because the contract had no execution procedure. Adds an explicit check-health section under Execution with real live probes (Zulip POST, pm2 jlist, GPU exporters .8/.110/.15:9400, Prometheus .116:9090, Grafana .116:3001, LiteLLM .116:4001) and a hard RUN LIVE, NEVER ECHO rule. Mirrors the gpu-monitor contract pattern. Single clean commit from master - no conflicts. Merge authority: captain (no-mistakes, yolo off).
abiba-bot added 1 commit 2026-08-22 23:59:35 +00:00
Add check-health section with live probes to infrastructure-monitoring contract
PR Pipeline — Authorize → Validate → Review → Merge / auth (pull_request) Successful in 4s
PR Pipeline — Authorize → Validate → Review → Merge / validate (pull_request) Successful in 11s
PR Pipeline — Authorize → Validate → Review → Merge / lint (pull_request) Successful in 16s
PR Pipeline — Authorize → Validate → Review → Merge / ai-review (pull_request) Successful in 13s
PR Pipeline — Authorize → Validate → Review → Merge / gate (pull_request) Successful in 1s
d6ad016ac9
Fixes the canned 'API UNREACHABLE (HTTP 000)' reporting. Adds an explicit
check-health execution section (Zulip POST, pm2, GPU exporters, Prometheus,
Grafana, LiteLLM probes) with a hard RUN LIVE, NEVER ECHO rule, mirroring
the gpu-monitor contract pattern. Captain priority 2026-08-22.
abiba-bot merged commit b835986d44 into master 2026-08-23 00:01:40 +00:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: SyslogSolution/prose-contracts#51